10. Check the LEDs on the I/O board to verify
power and data are reaching the dome
(
Figure 5).
a. The green ac power LED (CR9) glows
steadily when ac power is applied.
b. For Manchester or SensorNet: The yellow
comm. LED (CR11) glows steadily
(Manchester) or blinks (SensorNet). If this
LED is off, then probably one or both
communication wires are open or both are
shorted together.
For RS-422: Press and hold data test switch
SW1 and observe nearby red (CR12) and
green (CR13) LEDs; they indicate the
following:
Constant green,
Blinking red
RS-422 line correctly wired.
Constant green,
Red off
RS-422 "Data In –" shorted to
ac ground.
Constant red,
Blinking green
"Data In +/ –" wires reversed.
Blinking red,
Green off
"Data In +" shorted to ac
ground.
Both LEDs off
"Data In +/ –" wires shorted or
open.
Figure 5. Test switch/LEDs on I/O board
Reattaching the I/O Board
The following procedure refers to Figure 6:
1. If the wiring is OK, then pull the excess cable up
through the access hole.
2. Reinsert the I/O board.
Insert the board under the retaining fingers. The
board is keyed; it only fits into the base one
way. Press on the board to snap it into place.
3. Gently remove the dust cover.
Remove the cover from the 32-pin connector
and inspect the spring finger contacts. For
reliable connections, all contacts should be at
least 2mm above the surface of the connector.
CAUTION: Keep the dust cover for
use should you have to ship the base
and I/O board back to the
manufacturer.
Figure 6. Reattaching the I/O board
SW1
Red
(CR12)
Green
(CR9)
Green
(CR13)
Yellow
(CR11)
Comentarios a estos manuales